M400 Rebuild

product image

Request A Quote Online

Request A Quote

Or Call for Quote

(616) 201-8033

Complete disassembly of the strapping head, thorough cleaning of each part, visual inspection of each part for wear, replace worn parts, Paint castings, and black oxide items as required, replace electrical components as required, replace all air lines and fittings as required, complete reassembly of strapping head to specification. Test strapping head. return the strapping head to production status in almost as new condition.